Project 1.3.1 Site Visit
I visited the site with classmate Aaron where we took measurments using a tape mesure and took high quality photographs....
Project 1.3.1 - Surveying
For this project we have been given a building in the local Northampton area to survey. The aims of the project are to initiate...
1.2.3 Final elevations and plans
The funding team has now received the final elevations and plans of the pavilion from the draw team. I have attached them to this post....
1.2.3 Phone call to Travis Perkins
As I had little success with the emails, I decided to call the local Tavis Perkins branch. My part time course mate Richard informed me...
1.2.3 Email to Possible Sponsors
As I said in my last post, I am in the funding team for the current stage of the Pavilion project. I have taken the task of contacting...
1.2.2 The Pavilion Project
For the next stage of the project we had to split into groups and critically analyse the chosen idea. This meant looking into design,...
1.2.1 The Pavilion Project
The brief for the Intervention Pavilion project stated that we would design and build a pavilion that would celebrate the university's...
1.1.2 Frankenstein built environment
For the Frankenstein built environment project we had to design a collage of what we thought a future built environment might look like....
Project 1.1.1 Library Visit
In the library I found a number of interesting journals and decided n my 3 small works of architecture. Here are images of the works and...
Project 1.1.1 Lookup before you re-invent
This project required us to investigate what journals are available in the library in relation to architecture. We were to choose 3 works...